# PCI DSS preparation experience

> Field notes from 4 PCI DSS preparation projects: scoping card data, integration boundaries, and evidence packs before a QSA assessment — not certification by Orsun Tech.

We have worked on 4 PCI DSS projects where integration boundaries and card-data flows drove scope. This note describes how we prepare systems and documentation before a QSA runs the formal assessment.

[Book a call](https://cal.com/dmytro-dudariev-orsunpay/30min) [Describe your problem](https://orsuntech.com/contact#describe)

## What PCI preparation covers in our work

PCI DSS preparation means mapping where cardholder data enters your systems, which components touch it, and which integrations can stay out of scope. We trace checkout, tokenization, PSP hosted fields, and back-office tools so engineering and compliance read the same boundary diagram.

Orsun Tech is not a QSA. We help you reduce and document scope; the formal assessment is done by a qualified QSA you engage.

## Recurring patterns across four projects

[OrsunPay](https://orsunpay.com)  is a payment orchestration platform that connects you to licensed PSPs; it does not process or hold funds itself. When orchestration stays token-only, scope often shrinks; when engineers cache raw payloads, scope grows.

- Hosted fields and redirect flows versus API capture — and how that changes SAQ type
- Webhook and batch settlement paths that accidentally store PAN or track data
- Orchestration layers such as [OrsunPay](https://orsunpay.com)  kept outside card-data paths where possible
- Evidence packs: network diagrams, data-flow tables, and access-control lists auditors expect

## Typical artefacts before QSA engagement

A scope narrative your QSA can challenge, a gap list with owners, and integration briefs that show how PSP and application boundaries are enforced. We do not publish client names or certification outcomes on this site.

## Questions about this practice

### Will Orsun Tech certify us for PCI?

No. We prepare scope and documentation. A licensed QSA performs the assessment and issues the report.

### Do you implement scope reduction in production?

Consulting delivers maps and briefs. Engineering changes are a separate implementation engagement if you ask for them.

## Related services and insights

Related services

- [PCI DSS consulting](https://orsuntech.com/services/pci-dss-consulting)
- [Payment orchestration](https://orsuntech.com/services/payment-orchestration)

## Describe your problem

An independent technical answer for a round, an acquisition, or a decision you cannot delegate.

[Book a call](https://cal.com/dmytro-dudariev-orsunpay/30min) [Describe your problem](https://orsuntech.com/contact#describe)

Limited to 3–5 engagements per quarter. Senior people on every engagement.

---

Source: https://orsuntech.com/case-studies/pci-dss-preparation-experience
Language: en-US
Publisher: Orsun Tech — https://orsuntech.com/
Site guide: https://orsuntech.com/llms.txt
